Showing posts with label winterization. Show all posts
Showing posts with label winterization. Show all posts

Another piece of the winterizing puzzle was put in place yesterday with the completion of the irrigation system.  We finished in the moon light, which isn't saying much, it is out at 5pm now. Winterizing the irrigation system is not difficult, but it is important to do a thorough job.  When water freezes, it expands; and the plastic components of the irrigation system were not designed to expand.  Ensuring that all the water is out of the pipes, heads and valves makes for an easier start to the year in the spring.

We do not winterize our pump station. This provides the water for our fire sprinklers in the maintenance facility.  The pump station remains on and operational through the winter.  This does require a little extra work to cover vents and make sure the heater and thermostat are working.
We made lots of progress today towards finishing our on-course preparations for winter.  The greens are closed for the season and the temporary targets are in place in the approach.  Please do not walk on the greens until next season.  Tee markers, benches, ball washers, trash cans, signs and ropes are all off of the course also.  The Halfway House is closed for the season and cart use is finished for the season.  It has been a long year and the course is looking forward to some rest.  The irrigation system will be winterized starting tomorrow and our winter snow mold treatment will be going out later this week also.
We spent this morning removing the first snow from the sidewalks this season.  It was not a lot, and with the sun out today, will likely melt off quick.  This year doesn't deviate from our usual schedule of 1st-2nd week of Dec. for seeing snow.  In 2009 the first snow was Dec. 1st, and 2010 the first snow was Dec. 6th.

Our winter preparation checklist is complete for the year.  We are now in the process of beginning our seasonal maintenance on the equipment, starting with a thorough cleaning.

The drainage project on 11 fairway is now complete.  A heavy layer of topdressing was applied to the fairway when the project was completed.  One objective for the heavy topdressing is to protect the turf through the winter (like was done for the greens).  The sod that was laid will not have a chance to root this fall, so any extra protection will help.  This fairway was very heavily traffic with our equipment during this project as well.  This topdressing will aide the recovery of any weakened plants in the spring.  This picture shows a turf blanket down the middle which will remain through the winter.  The purpose of the blanket is the same as the heavy topdressing.  The blanket just add more protection.
This past weekend was the last weekend for the greens this season.  We put the temporary cups in play today, and ask that you avoid traffic on the greens until the spring.  During the cold weather, we do not want to subject the turf to any stress that it will not be able to recover from while dormant.  Also, traffic on frozen or partially frozen greens can cause significant tissue and/or root damage.

Here is a link to a good article from the USGA Green Section about traffic on frost or frozen ground: Playing Par With Jack Frost

We are also applying a layer of topdressing to the closed greens today.  This topdressing will be slightly heavier that the regular topdressing we apply through the golfing season.  The purpose of this topdressing is to act as a blanket for the greens through the winter.  The sand will provide a layer of protection from the wind when the greens are not covered with snow.
We have spent the last 2 weeks working towards closing the course for the winter and our list is about checked off.
  • irrigation system winterization was started on Wednesday and completed on Friday.
  • our final spray for snow mold was completed yesterday.
  • all benches, ball washers and trash cans are off the course.
  • the Halfway House is winterized and closed for the year.
  • the temporary cups are cut in the approaches, but the greens will remain open for a short while longer.
  • we are still battling a few persistent leaves from the oak trees at this point, but most of those leaves are on the ground now.
  • we are still working on the drainage project in 11 fairway - look for an update on the blog this week.
  • the ice rink is being constructed now, we will let you know when it is ready for skating.
  • cart usage has been suspended for the year.
It does not appear there will be many golfing days left this year.  If you do plan to play, there are no amenities on the course at this time.  All drinking fountains and restrooms are winterized.  All benches, ball washers, trash cans, tee markers and signs are off the course for the year.

The weather had the drainage work on 11 stalled this week, so we turned our efforts towards getting the accessories off the course for the winter.  Only a few trash cans and ball washers remain for any late season golfers.  All signs, boundary stakes, and tee markers have be brought in for the winter as well.  We closed the driving range tee this week and are almost finished filling the divots and having it ready for the winter.

The rain earlier this week has stopped the drainage work on 11 for a few days.  We received just under 2 inches of rain for the week.  The rain was heavy enough to allow us to get pictures of how the water moves across the fairway on 14 and down towards the approach.  This will be the next area that a large drainage project is done.

This picture illustrates why 14 approach is often wet.

Leaf clean up has been the concentration today.  The rain and heavy wind this week did a wonderful job of getting the majority of the leaves that were left in the trees onto the ground.  We will be working on cleaning leaves all of today and into tomorrow.  We feel like the fairway on 11 will be dry enough to allow us to revisit the drainage project tomorrow.
This winter we will have turf covers on the putting green and on a portion of the driving range tee.  Turf covers can be used to help prevent winter injury, and keep soil temperatures a little higher which allows for more rapid green-up in the spring.  These are plastic covers that consist of holes to allow for water and air movement through the cover.  Their greatest benefit for us comes when they create a greenhouse effect over the turf to trap heat and keep the soil temperatures higher.  The increased soil temperatures will allow for more growth earlier in the spring.

We covered the putting green to continue to aid in the recovery of the areas that were sodded and overseeded earlier this year.

The covers were put on the driving range tee to help with the divot recovery.  We do not anticipate these covers will allow us to open the tee sooner.  However, when we do open the tee next spring, we hope to have more of the divots healed from this year.
The irrigation system winterization was completed with no problems this year.  More detailed information about the system winterization can be found on last year's post about the same topic: Winterizing the Irrigation System.

On Thursday we closed the greens, and are now using temporary greens for the winter.  We do this before the soil on the greens begins to freeze.  This practice prevents unrecoverable wear during winter months, turfgrass damage, and soil compaction or displacement.  Reopening of the greens in the spring will occur as temperatures and soil conditions allow.





The main reasons for doing this, in no particular order are: (1) the inability of the grass to recover from wear, (2) traffic on frozen soils can cause much more damage to the grass, and (3) moist soils on the surface, and frozen soils underneath can result in compaction or foot print marks.


The unavoidable annoyance of cold temperatures and the cold soil temperatures in the winter causes the grass to stop growing.  If the grass is not growing, it lacks the ability to recover from damage.  Use of the green surfaces in the winter would cause thinning of the turf due to foot traffic.  Thinning of the turf in the warmer months is not noticed because the greens are continually growing and will fill in the tracking and scratches left from golf spikes.  Preventing all traffic on the greens will allow the surfaces to start the spring growing season in better shape for the coming year.


If the soil surface is frozen, this makes it much easier for the turf plant to be damaged.  The crown of the plant, which is the growing point of the plant, is located at the soil surface.  Any mechanical traffic over the frozen soil can cause much more damage to the crown of the plant.


In the spring, as the soils start to thaw, it is inevitable that the surface of the soil with be thawed, while underneath, the soil will still be frozen.  This opens up the possibility for soil compaction or, if the soil is saturated enough, dents in the green from foot prints causing an uneven surface.  (A picture is available of this in the file under "Further Reading" named Temporary Greens at NCC.  Though the soils in the picture are different from what we have, you get an idea of how bad it could be.)


On the green, we remove the cup, and fill the hole with sand for the winter.  Filling the hole with sand will prevent the edges of the cup from collapsing into the hole.  This make is easier to replace the cup in the spring.





A temporary cup and flagstick are installed in the approach to give golfers an area to hit to.




The short flagsticks are used to preserve our wooden flagsticks that are used through the summer.  It is also much more difficult for the wind blow over the shorter flagstick in the winter.





Reopening of the greens is dependent upon the conditions of the soil, and temperatures warm enough for the grass to begin growing.  Historically, this time has been around the last week of March or the first week of April.
Another step in winterizing the course is closing the Halfway House.  There are heaters inside the building, but as a precaution the water lines are drained and the water is removed from the lines using pressurized air in the same manner the irrigation system was winterized.



The first step is the close the valve on the main water line to the Halfway House.  This valve is located where the old maintenance building sat at the end of the driving range.  Then an air compressor is connected to the incoming water line in the Halfway House and water is forced back through the line to a drain near the 14th green.  This is done to remove the water from the line going to the Halfway House.  Once this is done, the air is redirected to the fixtures in the building.  Each fixture is turned on until air begins to blow out.



When air has filled the lines, RV anti-freeze is pumped into the lines, and poured into the toilets, sink drains and floor drains.



The coolers at the Halfway House are emptied and shut off.  The heaters are then turned on and set for the winter.
After the equipments use for the season is done, it is thoroughly cleaned before the start of it's winter work.  Our crew spends several days going through all of the equipment with degreaser, brushes, power washer, towels, and wax.  The equipment cleaning was started on Monday, and continue into next week.


The guys power washing and scrubbing the equipment.


 Our finished fairway mowers.

Once the equipment cleaning has been finished, the winter work on the equipment is done.  This involves sharpening all the reels and blades, oil changes, touch-up paint, etc.  Look for more updates on winter work of the equipment over the next few months.
Winter conditions bring the maintenance on the golf course to a halt. However, there are a few pathogens that continue their activity through the cooler months. These pathogens cause diseases most commonly referred to as pink snow mold and gray snow mold. Our efforts to control these pathogens and limit damage caused by the diseases consists of a fungicide application.






Pink snow mold is the most common snow mold in this area. Though both diseases can occur, gray snow mold is most common and most severe in areas with prolonged snow cover.



We began our snow mold applications on Friday. Greens, tees, fairways, and practice areas (all areas with bentgrass) will receive an application of fungicide. There will be some areas in the roughs and bunker faces that receive an application as well. Areas that collect snow drifts or are a north-facing slope tend to have prolonged snow cover and will be more susceptible to disease.



Pink snow mold


Gray snow mold


Friday we completed the application on greens, fairways, and practice areas. This coming week we plan to finish the applications on tees, and rough areas.
The winterization of our irrigation system is underway. We began the process on Tuesday afternoon, and should be finishing by Thursday afternoon. Winterization of the irrigation system involves removing the water from the lines and heads, as well as changing our pump station configuration.


Removing the water from the lines is easier than it sounds. This involves connecting a large air compressor to the piping system and allow the air to push the water out of the lines.



Air compressor used to fill the piping system with air.



This is showing the air compressor hose connected to the piping system.


Once the air compressor is connected, the heads are manually switched on at the satellite boxes to open the heads and allow the air to push the water out. The next two pictures show the water vapor in the air coming out of the irrigation heads.




Most courses power down their pump stations as part of the irrigation system winterization. However, our pump station for the irrigation system also pumps the water for our emergency sprinkler system in our maintenance facility. Shutting off the power to our pump station is not an option for us. We do have a valve that we close to block the water flow in the main line out of the pump station. This allows for all of the lines on the course to have water pushed through them while our pump station is still active and the emergency sprinkler system line is still pressurized. We have a heater in our pump station that keeps the water in the building from being exposed to freezing temperatures.
As nice as the weather was last week, it is that cold this week. As mother nature draws the curtains on another golf season, she draws the curtains on another working season as well. We are well on the way to having the course winterized for the year. Our benches, ball washers, signs and ropes are stowed away for the winter.

Over the winter we will repair any benches that need it, and add a layer of oil to the wood. We will do the same to out seed and soil boxes, cooler boxes, beverage stations, and trash can containers as well. The ball washers and trash cans will be painted as needed.

Tomorrow our irrigation system is scheduled to begin it's winterization.

Previous PostOlder Posts Home