Changes around 1 tee have been underway since last fall.  Several projects have been done to provide a fresh look to this area.  We are nearing the finishing stages and hope to have it wrapped up before the Fireworks Extravaganza on June 29th.

The project began last fall when 3 spruce trees were removed to highlight a maturing Bur Oak.  Clearing of the overgrown shrubs behind the tee continued last week.  The remaining shrubs that still stand behind the tee will be replaced with this project.  We have a few steps to complete before we can remove those plantings and introduce new.

The curb was cut today to accommodate the new routing of the path, which will be out of the circle drive rather than around the back of the tee.  The former cart path behind the tee will be cut narrower and used as a walking path.  The additional area from narrowing the path will be used for the new plantings.

Work is also being done today to trim up the pines left of 1 tee.  This work also involves defining grassing lines and spreading fresh pine needles under the trees.
Big changes will continue to be happening around the 1st tee in the coming weeks.  Last fall three spruce trees were removed to highlight a maturing Bur Oak.  This spring the aging and overgrown junipers and arborvitae behind the tee will be removed to make way for new plantings.

The plantings behind 1 tee have become overgrown and unsightly.  The objective of this project is to maintain the screening between the tee and the circle drive, but improve the aesthetic of the area due to it proximity to the front of the clubhouse.

When this project is complete, the cart path will no longer run behind the tee.  The curb will be cut to allow access to the 1st tee from the circle drive.  A walkway will be maintained where the cart path currently is, and the planting bed will be made larger to accommodate new plantings.  The new plantings will be similar to other that are in front of the clubhouse.  These models give an idea of what the new planting may look like when the project is complete.

This project will begin as the cart path on 9 is finishing up.  This will be a great change for the look at the front of the clubhouse.

While we were under snow in the first week of March, we went inside the Clubhouse for one last winter project.  Here is the blog post about that ("One More Winter Project").  Yesterday, the other half of that project was completed.  There was much anticipation for the new TV, but most did not know what was actually going in.  This will likely turn out to be a popular place to watch the games.  There is a good chance hockey fans will be watching the Blackhawks on Thursday.
As you have been in and out of the clubhouse the past two weeks, you probably noticed our progress on the lawn and flower beds.  Not much changed, but it does have a fresh look to it.  Some of the bed lines changed and we laid new sod.  A new shrub is on the way to replace one that was removed.  This area will only look better as we move into summer.

Here is the before picture in front of Club 21.  The shrub at the corner was removed and will be replaced soon.

Here is the after picture.  New sod, mulch and cleaned up beds.

Here is the before picture for the entrance by the dining rooms.

We liberated stones from another area of the course to make the bed larger and smooth out the bed lines.  We also made a small bed at the top to hide the foundations of the sidewalk and steps.

Here is the after picture.

Here is a before picture of the entrance near the proshop.  We made this bed bigger and also included a smaller bed again to hid the sidewalk foundation.

Here is the after.

Not a lot of changes, but it does have a fresh look.
We always get the "What do you do in the winter time" question.  Here is your answer, move golf carts to the Ballroom.



Obviously, this is not all we do, but was one project for today.  If you are wondering why we are putting golf carts in the Ballroom, come to Casino Night tomorrow night to find out!
It took a while, but winter has finally come.  The biggest snow of the season has come and gone and left plenty of opportunities to enjoy the snow.  Sledding, snowshoeing, and cross country skiing will be wonderful this week.

Another chance for an early golf season seems to have been blanketed by the snow.  A stark contrast from last season.  A year ago today was almost 70 degrees!  Those warm temperatures continued through March including the unprecedented 8 straight days of 80 degrees that started March 14th.  This return of more normal seasonal weather has allowed us time for one more project in the clubhouse.

This last project involves modifying the cabinet in the Member's Grill to accomodate a larger television in the future.  This series of cabinets was installed several years ago and has been modified as television technology has changed.  This project is just the next progression, for the next television.

We cut our the upper cabinets and will refinish the wall, hide the cable, and put a top on the lower cabinets.  Some additional sanding and staining will have it finished.
We took advantage of the warmer temperatures this week and crept outside to trim some shrubs and trees in the landscaping around the clubhouse, halfway house and entrance.  This is a good practice to prevent plants from over growing and ensuring they keep a proper shape.

This patch of junipers near the putting green was overgrown and the time had come to trim it back.

Here is a picture after the junipers had been trimmed.  Not only will this ensure a plant that looks they way it is supposed to, it will allow more sunlight and air into the canopy which will make a healthier plant.  We will be working our way through all of the landscaping as the weather provides us favorable conditions for outside work.
Now that we are almost through January, it is time to get the blog going for the year.  Most of the activity taking place now has been in the clubhouse.  Several small projects have been taking place and they will be wrapping up very soon.  New ceiling tile was installed in the hallways near the locker rooms and in the ladies locker room.  Our staff did this work again this year.  Over the past 3 winters, Mario, Emilio and Torres have replaced all the ceiling tile in the clubhouse.

The fireplace needed some attention after a few bricks fell out of place on the back side.  New brick has been installed and the fireplace is back together.

The pro shop has a new look for the coming year. New paint has been put on the walls.

After the ceiling tiles were completed new carpet was installed in the hallways near the locker rooms and in the Member's Grill.
New carpet and new paint is happening now in the business offices.  Until that is finished, those managers have been forced to pass the time at the main bar.

No on-course projects have been planned for this winter.  The course is making it through winter with no problems to this point.  This pictures show our biggest snow of the season from last night.  I recorded this snow as our first snow cover because the snow on 12/28 did not cover all areas.  I can already tell this batch of snow is beginning to melt and does not look like it will last long.  Another unusual winter.

With the clubhouse being closed in January, we take that time to complete a thorough cleaning and any projects that need to be done.  This year was particularly busy in January.  Several projects were completed on schedule and the clubhouse is now ready for regular member service.  Come out this weekend for Dining on Friday and Saturday night, brunch Sunday, or the Super Bowl Party Sunday night and see the completed projects.

New carpet was installed in the front hallway, the Grill on the Green, and by the fireplace.  10 of the 12 HVAC units on the roof were replaced.  The ceiling in the Pump Room was replaced.  The ceilings by the fireplace and in the front hallway were replaced.  And, the hardwood floor by the door into Club 21 was replaced.

Here is a list of posts that highlight the projects in progress:

Ceilings In The Clubhouse

New Ceiling Going Up In The Clubhouse

Lots Happening At The Clubhouse

And some videos were made of the work also:




There are many projects happening at the clubhouse this week in an effort to be ready for regular business soon.  All these pictures were taken today.

The remaining HVAC units are going on top of the clubhouse.

Painting has started on the new ceiling in the Pump Room.

New carpet is going down in the fireplace room.

New carpet is down in the Grill on the Green.

New hardwood is going down in Club 21 by the doors, but I did not get a picture.

Our guys are taking a break from refinishing course supplies to polish the floors in the kitchen.

I will have some video up soon of the projects being done.
The crew spent this morning cleaning the parking lots and sidewalks of the biggest snow of the season.  We received about 5-6".  There was wind with the storm that created some deeper drifts.  This storm also brought with it the coldest temperatures of the season, with near 0 degree F expected for tonight.

The ice rink will not be ready again this weekend.  It is still not frozen through. Once it is frozen through, we will need a day to groom the ice smooth to be ready to skate on.  The freeze and thaw and snow, has created a bumpy surface.  We are not able to walk across the ice yet.  Rain and mid 40s is forecasted for Monday, which could delay us more.

The ceilings in the hallway and fireplace room have been completed.  You can watch two short videos of the work on those ceilings on YouTube:

Removing fireplace room ceiling

Replacing fireplace room ceiling

The ceiling in the Pump room is in the process of being torn out.

New drywall will be put up and painted in place of the old tile ceiling.

Watch for updates next week on the ceiling in the Pump room.  New heating units will be installed on the roof next week also.  The units will be disconnected on Monday.  A crane will be here Tuesday to remove the old ones from the roof and put the new ones on.

The new ceiling tiles are being put in place in the fireplace room and the hallway.  The cutouts for the lights were made first so we would be able to get lights back on in the room, then the full tiles were put in place.  The pieces that need to be trimmed will be done this week.

A few other projects are being done while the ceiling tiles were down.  The track the ceiling tile sits in was painted, and a few lights were moved around.  Also, some changes are being made to the music system, which won't be noticeable, but should make it easier to use.  We hope to be done with this as soon as possible.  A contractor will be in to renovate the ceiling in the Pump room, then new carpets will be put down in the fireplace room, Grill on the Green, and hallways.
We will be working on a few projects in the clubhouse over the coming weeks.  Changing out ceiling tile like we did last year is the first project being tackled.  This will be done in the room with the fireplace, and in the front hallway.  The ceiling in the Pump room will be done by a contractor later this month.  After the ceilings are completed new carpets will be installed by the fireplace, in the Grill on the Green and the from hallway.

The Ballroom is being used as a cache for all of the furniture from the rooms that are having work done to them.


Here is a quick video of Torres, Emilio and Mario taking down the ceiling by the fireplace.


The water was off to the clubhouse for a short time yesterday and into today.  A leak in the pipe between the well and clubhouse had developed.  We noticed something was wrong and had been troubleshooting the problem for several days.  The pipe was dug up yesterday when the leak was revealed in a fitting coming out of the well.  It has been fixed and the water in the clubhouse is back to normal.
Over the past week we have been working at replacing the ceiling tiles in the Grill on the Green room as well as the Member's Grill.  This project involved removing the old tiles, then painting the track and installing the new tiles.

Most of the work was spent trimming the new pieces to fit around the edges, lights, speakers, and sprinklers.

Both rooms have been completed and Shorty and Nick are working their way through the rooms doing the final cleaning.