Showing posts with label flowers. Show all posts
Showing posts with label flowers. Show all posts
The flowers are displaying the unfortunate consequence of dealing with a variety of weather conditions.  The hail from Monday night has left the flowers tattered and torn, but they will survive.

We are will be planting the flowers around our flag pole today.  However, the first step is to remedy a soil problem that has developed through the years.  Every winter when snow is removed, the circle drive receives a large pile of snow.  Usually, the snow has salt mixed in with it from the previous time the circle drive was salted.  Over time, this has resulted in excessive amounts of salts in the soil, which has led to a decline in the flowers through the season.  This year we are starting by removing the soil that is in the circle drive and replacing it with fresh soil.  After some warm weather and rain, which are both in the forecast, the flowers should get a good jump start for the year.
Big changes will continue to be happening around the 1st tee in the coming weeks.  Last fall three spruce trees were removed to highlight a maturing Bur Oak.  This spring the aging and overgrown junipers and arborvitae behind the tee will be removed to make way for new plantings.

The plantings behind 1 tee have become overgrown and unsightly.  The objective of this project is to maintain the screening between the tee and the circle drive, but improve the aesthetic of the area due to it proximity to the front of the clubhouse.

When this project is complete, the cart path will no longer run behind the tee.  The curb will be cut to allow access to the 1st tee from the circle drive.  A walkway will be maintained where the cart path currently is, and the planting bed will be made larger to accommodate new plantings.  The new plantings will be similar to other that are in front of the clubhouse.  These models give an idea of what the new planting may look like when the project is complete.

This project will begin as the cart path on 9 is finishing up.  This will be a great change for the look at the front of the clubhouse.
This week gave us some good examples of how plants react to hot weather.  Multiple days with heat indexes over 100 degrees has been enough for the plants to show typical stress symptoms of growing conditions that are not optimal.  Up to this point of the season, aside from being a little wet, the weather has been very conducive to growing plants that we do.  This allowed us to maintain a very healthy plant - one that can withstand a stretch of temperatures like we have had this week.

 The Salvia that is in the circle drive in front of the clubhouse has had fantastic color all season.  This week the blooms have slightly faded in color.  Some petals have even fallen off.  We have been diligent about keep moisture available to the plant, but the heat has been too much stress.  This is a particularly unique situation on the property due to its location.  This bed is in the center of a circle of asphalt which exacerbates the hot temperatures.

This picture shows the temperature of the asphalt adjacent to the planting bed.  134 degrees!  The radiant heat from the drive is too much for the flowers to handle.  Thankfully, we only receive these temperatures for stretches at a time.  Once a few days of cooler temperatures set in, the plants will have a chance to recover.  And, hopefully, present the vibrant color it had earlier, before another heat wave comes through.  It's summer in Chicagoland, so we are bound to have a few of these stretches.  It helps us to appreciate the cooler stretches even more.
Our crop of summer flowers has arrived and we have begun the process of planting them.  We have another delivery coming, but the first one included the majority of plantings.  This first set will be done by the end of the week and includes all of the flowers for the entrance and clubhouse.

The picture above is what the bed around the flagpole looks like today. It is hard to believe what they will look like after a couple of months of growth.  This picture is from a couple of years ago, and shows what you can look forward to.  We will begin a regular schedule of watering and fertilizing in a couple of weeks.  We like to get them in the ground and have a little growth in the soil before we begin to push them.
As you have been in and out of the clubhouse the past two weeks, you probably noticed our progress on the lawn and flower beds.  Not much changed, but it does have a fresh look to it.  Some of the bed lines changed and we laid new sod.  A new shrub is on the way to replace one that was removed.  This area will only look better as we move into summer.

Here is the before picture in front of Club 21.  The shrub at the corner was removed and will be replaced soon.

Here is the after picture.  New sod, mulch and cleaned up beds.

Here is the before picture for the entrance by the dining rooms.

We liberated stones from another area of the course to make the bed larger and smooth out the bed lines.  We also made a small bed at the top to hide the foundations of the sidewalk and steps.

Here is the after picture.

Here is a before picture of the entrance near the proshop.  We made this bed bigger and also included a smaller bed again to hid the sidewalk foundation.

Here is the after.

Not a lot of changes, but it does have a fresh look.
Our summer annual planting beds have all had their flowers planted for the summer.  This is a process that take several days to complete.  There are many annual beds around the clubhouse, two at the entrance, and a few more at the halfway house.  We will be spending our time concentrating on keeping them watered over the next or two until they are well established.  During the summer months, we do make a fertilizer application to them weekly with our sprayer.
The summer flowers have arrived and most of them have found a place in the beds around the clubhouse and entrance.  This is usually a process that takes a few days to finish.  The flowers that were in place this spring are available for you to take if you choose.  They are underneath the pine trees near the parking lot.

The crew hard at work planting flowers.

Disease symptoms resulting from fungicide pathogens were noticed on Sunday, and so, we have applied our first fungicide application on the course.  The picture on the left is the disease dollar spot and was taken on Sunday in a patch of bentgrass in the rough.  We monitor the course for disease symptoms when weather conditions favor disease, but we also will be on a regular fungicide program through the summer.  We make these applications on the club's closed day, usually Monday. (Tuesday this week because of the holiday)  If you have any questions about what we apply to the course, please contact us.

Here is a picture I capture on Memorial Day morning. I thought it was appropriate.
Much of this week was spent sodding or mulching flower beds and trees.  Most of the sod was laid on the hill left of 3 green with the rest of it being used in various spots across the course.  The hill at 3 will be roped off for a period of time. We ask that you do not play from the new sod.  It will be marked as ground under repair until further notice.



Another drink station has been added near the driving range tee.  This will be convenient for before the round and walking from 9 green to 10 tee.

Porfirio and Joel digging out for the stones under the drink station.

The course is beginning to shape up!

There was on upside on Wednesday.  Though the course was too wet to accomplish anything, our summer flowers arrived on Wednesday morning.  This turned out to be great timing.  We were able to delegate most of the crew to start planting flowers.

The spring flowers that were in place in the beds were removed.  We work the soil lightly, then apply a fertilizer before planting the summer flowers.

By the end of the week we were able to plant most of the flowers.  The flowers for the flower pots will be arriving later.  Stay tuned for a later post when I will highlight what kind of flowers are planted around the clubhouse.

The flowers that were removed from the beds are still in good shape.  You are welcome to help yourself to however many you are interested in.  They will be underneath the pine trees near the south parking lot until the middle of the week, at which time they will be disposed of.


I took this picture today of the flowers by 1 tee and had to share it with you.
No April Fools Joke!  Thursday, April 1st, the course will be ready!  Carts will be available, the driving range and chipping green will be open, and the halfway house will be open.  The abnormally warm weather has been good to the course.  The soil temperatures are rising quickly, and the grass is beginning to grow.  The partial crew we have had this week have gotten lots done, but still have more to do.

The spring flowers have arrived and are in place for the Easter weekend.


We have started our first round through the bunkers this year.  This job normally takes a few days to ready the bunkers after the winter neglect.  This job involves cleaning out the debris that has entered the bunker, then removing any soil that has settled at the bottom of the bunker.  After the contamination is removed, the sand is replaced from any washouts, then raked.

The course supplies are back on the course.  The benches, trash cans, ball washers and tee markers are back at home on the tees.  And, signs and target posts are back out.

Wednesday we made an application of gypsum to the fairways.  If you are out on the fairways this week, the white material on the fairways is the gypsum.



This material will break up quickly and shouldn't be very noticeable after a mowing.  The white streaks in the fairway are from the dust from this products.




Gypsum is calcium sulfate, and we use it to supplement our soil which is a little deficient in calcium.
I feel like I am typing the same thing every week, but I'll do it again. It was a wet week and the course remains very wet. We were able to get a few big projects done despite the uncomfortable conditions. Monday we were able to topdress greens and fairways, and begin to remove the dead summer flowers.

The recently betrothed Emilio topdressing greens. Emilio and the lucky lady plan to be married sometime next year.

Torres brushing in the topdressing on the greens.

Cesar applying the fairway topdressing. We will do one more application of fairway topdressing this year.

There have been a set of trees identified on the course as being key trees to the playability and aesthetics of the golf course. Extra measures have been implemented to protect their well-being. A company was out this week to install lightening protection to some of these tree.

Lightening protection being installed to a tree on the left side of 13 fairway.

On Friday we began some of the fall aeration we will be doing. It was decided to aerate the junior tees due to the more apparent thatch layer. These tees are soil tees and hold water for longer periods of time resulting in an environment more conducive to thatch production.

One of the junior tees after being aerated.

The back practice tee and middle practice tee were also aerated on Friday.

Thanks Greg!

We also replaced a few of the retired summer flowers with some flowers for the fall and into early winter.

We received our first hard frost of the year this past Friday evening. This brings the end to the flowers and a beginning to frost delays.


On the golf course frost refers to ice crystals which appear on solid surfaces in the absence of precipitation. There are two such forms of frost: “rime” and “hoar”. “Rime frost” typically occurs under conditions of high atmospheric water content (vapor and/or liquid) and moderate wind speeds. It forms rapidly and adds a dull, matte finish to the surface on which it adheres. Rime formation is most common during cold fogs when water droplets come in contact with subfreezing surfaces. “Hoar frost” on the other hand, forms through the slow deposition of water vapor directly on a surface as ice. This is what we contend with most frequently on turf. It forms best when winds are light, which is often the situation during clear, cold nights. By accumulating slowly, hoar frost forms delicate, interlocking crystals that grow outward from the surface with a feather, fern, or flower pattern. Hoar frost's white color is caused by small air bubbles trapped in the ice crystal that reduces its transparency. The smooth faces of the hoar crystals cause them to glitter in the sunlight, particularly at the low, early-morning sun angles.

Frost occurs on clear cold nights when turfgrass plants reradiate heat. As the plant loses heat to the atmosphere the plant leaf cools. If the plant temperature is cooler than the air temperature then moisture from the atmosphere will condense on the leaf. If the leaf temperature drops below freezing then the water freezes and frost forms. This will occur even if the air temperatures are slightly above freezing. It is not uncommon to have frost form even if the air temperature is in the mid to high 30's. Frost does not form as readily on cloudy nights because the clouds reflect, or absorb and then reradiate the energy back towards the turf. Frost does not form as readily when a breeze is present. The breeze causes convection (a transfer of heat from the mixing of the air closest to the plant with the surrounding atmosphere); this helps to buffer the drop in leaf temperature. This also promotes evaporation of the water droplets from the leaf surface. Areas with little or no slope have a greater potential for frost formation than areas with greater slope. This is because air moves down the slope resulting in a greater potential for mixing. This is manifest when we see heavier frost formation in flat low lying areas.

Frost will normally form early in the morning before sunrise. This makes sense as the plants have been reradiating energy throughout the night, their leaf temperature will be the coolest prior to daybreak. Actually frost may continue to form even after daybreak because the low angles of light coming from the sun may not directly hit the leaf surface. Frost itself does not cause damage to the turf, but injury does occur when traffic is allowed on frosted areas. When frost is present on the grass plant the fluid surrounding the cells becomes frozen and takes on a crystalline formation. The frozen crystals have sharp jagged edges. Cart and foot traffic cause the sharp crystals to rupture the cell walls. This produces internal damage in the leaves of the plant. Turf damage is generally superficial. This is not to say that traffic should be allowed on frosted turf. If traffic occurs, whether it is foot or mechanical, damage caused by crushing the leaf blade will occur. Initially the damage will appear as a purplish to black discoloration of the turf. The damaged turf will then progress to a straw color. This discoloration is visible for a prolonged period of time.

If discolored turf was the only damage that Superintendents had to contend with then play could proceed as normal. Unfortunately there are more profound consequences. The discolored areas are weakened. This turf is more susceptible to disease pressure from fungal pathogens and is vulnerable to weed invasion, specifically Poa annua (annual bluegrass). If damage has not been sustained by the crown of the plant, then recovery will occur from the generation of new leaves. It can take several weeks for this recovery to occur. When the frost burns off, the grass plant thaws and it is possible to let play proceed. Under normal conditions play may proceed when the air temperature at ground level reaches 40 degrees.

Frost delays are frustrating for both golfers and the golf course maintenance staff. Superintendents are sensitive to the needs of their membership. They understand that the delay of an early morning tee time can affect a golfers schedule for the balance of the day. For this reasons we do not delay play unless it is absolutely necessary. Our goal is to provide the best conditions possible for all members and their guests. When frost is present, we monitor the course condition closely. We communicate and work directly with the pro shop so as to open the course as quickly as possible. We appreciate your understanding and patience as we encounter early morning frost delays.
Previous PostOlder Posts Home