From The Course This Week

The leaves have started to change and the fall color is showing.  It is very nice to see the color, but with that comes the falling leaves.

We try to keep up as best we can, but when a breeze is blowing like it is today, it is a futile effort.

The drain is completed on 14 fairway.  This will eliminate the lagging wet area after rains.  This is the first of several drains that we plan to install this fall.

The bag that is sitting off the right of hole 10 is the silt and muck that was pumped out of the pond on 11.  The bag is designed to hold the silt while allowing the water to seep through.  Once the water has dried, the bag will be cut from the pile of silt.  This will take about 60 days.
Next PostNewer Post Previous PostOlder Post Home

0 comments:

Post a Comment