8 Cart Path

Before the snow came we were able to make more progress on the cart path near the 8th green and 9th tee.  The area was fully excavated and the soil was piled in the dump.

Here is a picture of the base layer of stone being added.  Though I don't have a picture, the addition of this layer of stone was completed.

We will not do any further work on this path until spring.  At that time we will pack done the base layer and add the red gravel to the top.