More Drainage Projects

The first two drainage projects of the fall were completed this week.  Both areas exhibited the same problem.  They were areas where irrigation water and rain ran down the path and collected on the edge.  We put in a basin at the edge of the cart path and connected it to another nearby basin.

One of the areas was between 16 and 18 green.  The basin at this location had already been installed, the crew just needed to trench a line for the pipe.  The other area was by the chipping green.  The next area where a similar project will be done is at 4 tee.
Next PostNewer Post Previous PostOlder Post Home

0 comments:

Post a Comment