The stone walk from the parking lot was replaced last week with different paving stones. The previous path had become uneven from the stones settling over time and as a result, more difficult to walk on. The old stones were removed and some soil was excavated to allow the installation of a gravel and sand bed for the new stones to sit. The new stones that were put in place were left over from other projects. The edges of the new walk will receive added attention soon to level the drop from the new walk to the existing grade.
The new seed on the fairway nursery is germinating very well. The blankets will be removed soon in preparation for it's first mowing.
0 comments:
Post a Comment