I did not think I was going to be posting this until tomorrow, but the crew was able to finish the drain on 1 fairway today. This should cure the chronic wet area, and keep ropes off the fairway after rains. It will take a few weeks for the sod to grow back together, maybe longer if this weather does not warm up soon.
Part of the crew is laying the tile in the trench, while the other part is following with gravel.
The finished product.
0 comments:
Post a Comment